Structural Engineering/Load-Bearing Wall Removal
Load-bearing walls
We analyze your framing, design the beam and post details, and deliver stamped plans your contractor can build from and your jurisdiction will approve. Most load-bearing wall projects are turned around within 5 to 10 business days from site visit.

What is involved
A wall that carries the roof or the floor above cannot simply come out. The loads it carried have to go somewhere: into a beam sized for the span, into posts that carry the beam, and into a foundation that can take the new point loads. In Florida the roof loads include wind uplift, so the connections matter as much as the beam.
Most load-bearing wall projects are turned around within 5 to 10 business days from site visit, as on every project we handle.
Who this is for
You want an open kitchen or a bigger room and your contractor says you need an engineer. You do: the permit requires stamped plans, and the beam has to be right.
You need the beam and post design, the connection details and a stamped set that passes review, on your schedule.
Fast, permit-ready structural sets so the renovation stays on its timeline.
Tell us what you need. We'll get back to you within one business day with a clear scope, timeline, and quote. No pressure. No runaround.